01
The work that was left out
Over the last fifty years, factories got machines, software and supply chains built around them. Output per hour worked in American manufacturing more than doubled over that time, by the measures of the Bureau of Labor Statistics.
Construction went the other way. Austan Goolsbee and Chad Syverson (2023) find that value added per worker in U.S. construction has fallen over most of the period since 1970.
The crews that put up and repair buildings, and the systems that bring those buildings power, water and a network, are a large part of the physical economy. Most of that work is still planned on paper, priced from memory and checked by eye.
We think this is the largest body of work left for software and machines to change. It is also the work that decides whether a family has heat, water and a working phone tonight.